This item is retained in the archive. Its relevance today is not confirmed: check the original source before using past queues or restrictions for planning.
Putin Holds Meeting with Transport Minister Yadrov
According to the meeting material, work at six checkpoints was completed in 2026, and an experiment from 2027 is to cut control procedures for freight transport to 10 minutes.
In 2026, according to the material on the meeting between Russian President Vladimir Putin and Transport Minister Dmitry Yadrov, work was completed at six checkpoints. FGI Rosgranstroy reconstructed the Pogranichny and Kraskino road checkpoints on the Russian-Chinese border section, and the Khasan checkpoint was opened as the first road border crossing on the border with North Korea.
Technical equipping was also completed at the air checkpoints Petropavlovsk-Kamchatsky (Yelizovo), Blagoveshchensk and Yuzhno-Sakhalinsk (Khomutovo).
One key task remains reducing the time for control procedures for freight transport to 10 minutes. According to the material, this is to be helped by the intelligent checkpoint technology—a set of technical and information systems for automated collection, storage and analysis of data on vehicles and cargo.
The technology is currently in pilot operation at the Tagirkent–Kazmalyar checkpoint on the border with Azerbaijan. From 2027, an experiment to reduce waiting time and control procedures to 10 minutes is to start; it will cover six border crossings.
This LogisticsSOS summary was prepared with AI assistance. The original source is linked above; information may require further verification.